• پارسی (Persian)

Metro - line6

Study & Design of underground Station N4 in Line 4 of Tehran Metro Employer: Tehran Metropolitan Railway Company - Subway
Project management : Gueno Consulting Engineers
Structural Consulting Partner: Sazbon Pajouh Consulting Engineer Co.
Responsibility and cooperation: studies, stability analysis and design of the underground executive method of the station
Duration of cooperation: December 2007-December 2009
Project Overview: in the construction and drilling of the station, it is not possible to make use of drilling because it has experience in designing underground spaces, so the company has proposed a tunnel drilling method for the station because of experience in designing underground spaces. The approximate area of the N4 station lies below the road of victory and at its junction with the Imam Ali highway. the method of drilling and implementation of this station is similar to the method performed at E4 station in line 4 of tehran metro.
Collaboration Services Description: The implementation of large underground spaces in urban areas at low depths has complexity and complexity. In this regard, experts of sazbon Pajouh Consultant Co. who have experience in designing and consulting during the execution of such projects as Nation (N2) station and three way lines 4 and 2, as well as lines 4 to 6, underground, with the implementation of concrete precast retaining system, by performing Studies and analysis of stability and design, precursor method, such as concrete arch, are in the process of conducting studies and design appropriate to the location of the project.


Powered by PARS DATA